Powered precision ERP for solar and electronics makers

Solar & electronics ERP that tracks every part, every serial, every site

Multi-level BOMs, shortages, SMT production, test yield, serial traceability, warranty and solar installation projects in one system, built for EPC companies, module and inverter makers and electronics manufacturers.

  • Serial traceability
  • Shortage planning
  • EPC project tracking
One connected flow

From BOM to rooftop in one system

Engineering, purchasing, production, testing, installation and service share the same item and serial data.

  1. Design
  2. BOM
  3. Procure
  4. SMT
  5. Test
  6. Pack
  7. Install
  8. Service
Why companies switch

Five fuses that keep blowing

Each one stops a build, delays a site or costs a warranty claim. Each one has a fix.

BOM in spreadsheets

Engineering changes never reach purchasing on time.

Fixed with: Multi-level BOM with revisions and ECOs

Component shortages

One missing part stops a whole build.

Fixed with: Shortage reports from BOM, stock and lead times

No serial history

A field failure cannot be traced to a reel or lot.

Fixed with: Serial-to-component genealogy

Warranty guesswork

Claims are checked against invoices by hand.

Fixed with: Warranty by serial with RMA workflow

Projects on WhatsApp

Solar site progress lives in chats and photos.

Fixed with: Project stages, BOQ and site reports in one place
Solar project quote

Price a solar project in seconds

Set system size and per-watt costs to see the project price and expected yearly generation. Figures are illustrative; your ERP uses your real price lists and BOQs.

Converted at approximate rates. Your choice is remembered across pages.
  • Modules
  • Inverter & BOS
  • Installation & margin
Project price
Price per Wp
Generation per year
Panels (550 Wp)

Yearly yield is kWh generated per kWp installed; it depends on location and tilt.

BOM · INV-5K-H rev D3 levels · 8 lines shown
  • 5 kW hybrid inverter1 pcINV-5K-H
  • Power board PCBA1 pcPCBA-PWR-03
  • IGBT module 1200 V2 pcsLead time 10 wk
  • DC-link capacitor4 pcsAlt. approved
  • Control board PCBA1 pcPCBA-CTL-07
  • MCU 32-bit1 pcShortage: 120
  • Passives kit (0402)312 pcsReel-fed
  • Enclosure and heat sink1 setSub-contract
BOM management

Every level of the product, one source of truth

Multi-level BOMs show what each assembly needs, which parts have approved alternates, and where long lead times or shortages will hit. Sample inverter BOM.

See BOM management
SMT production & yield

Watch a board move down the line

Every station records pass and fail. First-pass yield for the line is the product of each station's yield. Sample data.

  1. Paste printer99.6%
  2. SPI99.1%
  3. Pick and place99.4%
  4. Reflow99.8%
  5. AOI98.7%
  6. ICT / FCT97.9%
Line first-pass yield94.6%

Six stations at 97.9% to 99.8% each still multiply to 94.6%. The ERP shows which station loses the most boards.

Component traceability

One serial, its whole history

Scan a unit's serial to see the line, boards, component reels, supplier lots and test results behind it. Sample lookup.

See traceability
INV5K-26-004417
  1. SerialINV5K-26-004417
  2. Built onLine 2 · 09 Oct 2026
  3. PCBAPCBA-CTL-07 rev C
  4. MCU reelReel R-88213 · date code 2534
  5. Supplier lotLot 7Q41 · approved vendor
  6. TestsAOI pass · FCT pass · burn-in 4 h

Last 100 warranty claims, by outcome (sample)

Claims received
100
Within warranty
86
Repaired
61
Replaced
21
Closed
79
Warranty & RMA

Claims checked by serial, not by guesswork

Warranty runs from the invoice or installation date of each serial. Claims move through repair, replacement or credit, and failure reasons feed back to engineering.

See warranty management
Solar project installation

Every site from survey to handover

Each project tracks its BOQ, material issues, site progress, photos and commissioning. Sample projects.

Rooftop · 50 kWp · schoolInstall
Ground mount · 1 MWpDesign
Rooftop · 10 kWp · homeCommission
Carport · 120 kWpApproval
Integrations

Connected to machines, testers and sites

Line data, test results and site updates flow in without manual entry.

SMT machines and AOILine output, rejects and feeder data
Serial label printersSerial and QR labels at end of line
Test stationsICT, FCT and burn-in results
Accounting & GSTTally, Zoho Books or our finance module
Inverter monitoring portalsGeneration data for service
Site team appPhotos, checklists and sign-off
Implementation

Live in about 10 to 12 weeks

A typical rollout with a pilot line or pilot project before full go-live.

W0W3W6W9W12
Discovery and process mapping
Items, BOMs and routes
SMT, test and serials
Warranty and RMA
Projects module
Training, pilot, go-live
Results

What solar and electronics clients aim for

Typical improvement targets we plan against, not guarantees.

Serial traceabilityevery unit, every part
Shortage surprisesseen weeks earlier
First-pass yieldtracked per station
Project statuslive for every site
Who it is for

Built for makers and installers

Tap your segment for the most relevant page.

Which modules do you need?

Get a free module recommendation for your business in a few minutes.

Start the free ERP audit
FAQ

Solar & electronics ERP questions

Straight answers to what manufacturers and EPC companies ask us most.

What is a solar and electronics ERP?

An ERP for businesses that build or install electronic and solar products. It manages multi-level BOMs, purchasing against shortages, SMT and assembly production, test results, serial traceability, warranty and RMA, and solar installation projects alongside sales, inventory and accounts.

Can it handle multi-level BOMs and engineering changes?

Yes. BOMs can have any number of levels, approved alternate parts and revisions. Engineering change orders update purchasing and production from a set effective date.

How does serial traceability work?

Each finished unit gets a serial number. The ERP links it to the PCBAs, component reels, lot and date codes, suppliers and test results used to build it, so one lookup shows its full history.

Does it track first-pass yield?

Yes. Results from AOI, ICT, functional test and burn-in are recorded per station, giving first-pass yield, defect Pareto and rework history by product and line.

Can it manage solar installation projects?

Yes. Each project carries its survey, design, bill of quantities, approvals, material issues, site progress, commissioning and handover documents, with costs tracked against the quote.

How is warranty handled?

Warranty starts from the invoice or installation date for each serial. Claims are checked automatically, then moved through an RMA flow of repair, replacement or credit.

Can it connect to SMT machines and test stations?

Yes, where the machines export data. We also use simple scanning at each station when direct links are not possible.

How long does implementation take?

Typically about 10 to 12 weeks for one factory or EPC business, including BOMs, production, serials, warranty, projects, training and a pilot.

Get In Touch

Ready to power up?

Tell us what you want to build, your products, plants and current tools. We reply within 4 business hours with honest advice.

⏰
Response TimeWithin 4 business hours (your timezone)
Send Us a Message