Reshaping efficiency ERP for moulders and rubber processors

Plastics & rubber ERP that counts every shot, every gram, every mould

Moulds and shot life, machine scheduling, compound recipes, resin lots, regrind and scrap, OEE and per-part costing in one system, built for injection moulders, extruders and rubber product makers.

  • Mould shot-life alerts
  • Live OEE
  • Per-part costing
Why moulders switch

Five profit leaks on every shop floor

Each one is invisible on paper and obvious in the ERP.

Moulds fail without warning

Shot counts are kept on paper, so maintenance happens after a breakdown.

Fixed with: Shot-life tracking with maintenance due alerts

Cycle time drifts unnoticed

Small slowdowns quietly cut daily output.

Fixed with: Live cycle time vs standard on every machine

Regrind and scrap untracked

Nobody knows how much material is lost or reused.

Fixed with: Every kilo of scrap and regrind weighed and costed

Compound batches vary

Rubber recipes and mixing records live in notebooks.

Fixed with: Versioned compound recipes and batch records

Quotes miss real cost

Part prices ignore resin swings and machine rates.

Fixed with: Per-part cost from resin, cycle, cavities and rate
Per-part costing

Know the real cost of every moulded part

A sample 28 mm cap. Adjust resin price, cycle time and cavities to see cost per part and per 1,000. Figures are illustrative.

Converted at approximate rates.
Parts per hour
Material / part
Machine / part
Cost per 1,000 parts

Assumes 2.4 g part + 0.4 g runner per cavity and a machine rate of ₹900/hour (converted to your currency).

OEE tracking

Overall equipment effectiveness, live

OEE multiplies availability, performance and quality. Move the sliders to see how small losses compound. World-class is often quoted around 85%.

OEE

Mould management

Every mould's life, at a glance

Shot counts update automatically. Moulds near their maintenance limit turn amber so you service them before they fail. Sample data.

M-114 Cap 28 mm · 16 cav
812,000 / 1,000,000 shots · 81%Healthy
M-207 Crate lid · 2 cav
455,000 / 500,000 shots · 91%Maintenance due
M-031 Pipe fitting · 4 cav
210,000 / 800,000 shots · 26%Healthy
M-088 Gasket · 24 cav
960,000 / 1,000,000 shots · 96%Maintenance due
Compound NBR-70 · rev 4
NBR polymer100 phr
Carbon black N55060 phr
Plasticiser DOP12 phr
Zinc oxide5 phr
Stearic acid1 phr
Sulphur1.5 phr
Accelerator2 phr
Hardness 70 ± 5 Shore ARheometer t90 ≤ 4 min
Compound management

Rubber recipes, scaled and recorded

Recipes in parts per hundred rubber (phr) are versioned and scaled to each mixing batch, with test results recorded against the batch. Change the batch size to see weights update.

Regrind and scrap

Close the material loop

Runners and rejects are weighed, granulated and returned as regrind within the limit you set for each product. What cannot be reused is valued and sold.

  1. Virgin resin
  2. Moulding
  3. Good parts
  4. Runners & rejects
  5. Granulator
  6. Regrind (up to set %)
Integrations

Connected to machines, scales and accounts

Shots, weights and downtime reasons flow in without manual entry.

Machine PLCsShot count, cycle time and alarms from moulding machines
Weighing scalesMaterial issue, scrap and regrind weights
Label printersLot-coded carton and pallet labels
Accounting & GSTTally, Zoho Books or our finance module
Resin price updatesKeep part costing current
Shop-floor tabletsDowntime reasons and quality checks
Implementation

Live in about 8 to 11 weeks

A typical single-plant rollout with a pilot cell before full go-live.

W0W2W4W6W8W10
Discovery and shop-floor walk
Items, moulds and recipes
Machine and scale connections
Lot labelling and QC checks
Training and pilot cell
Go-live and support
Results

What plastics and rubber clients aim for

Typical improvement targets we plan against, not guarantees.

OEE visibilityper machine, per shift
Unplanned mould downtimefewer breakdowns
Scrap trackedevery kilo accounted
Quote accuracyreal per-part cost
Who it is for

Built for every polymer process

Tap your segment for the most relevant page.

Which modules do you need?

Get a free module recommendation for your plant in a few minutes.

Start the free ERP audit
FAQ

Plastics & rubber ERP questions

Straight answers to what moulders and rubber processors ask us most.

What is a plastics and rubber ERP?

An ERP built for moulders, extruders and rubber processors: it manages moulds and shot life, machine scheduling, compound recipes, resin lots, regrind and scrap, OEE and per-part costing alongside purchasing, sales, inventory and accounts.

Can it track mould shot life and maintenance?

Yes. Shot counts come from machines or production bookings. Each mould has a rated life and maintenance interval, and the ERP alerts you before maintenance is due or the mould nears end of life.

How does per-part costing work?

Part cost combines resin cost per part (part plus runner weight, adjusted for regrind), machine hour rate divided by parts per hour (from cycle time and cavities), and overheads. Quotes update as resin prices change.

Does it calculate OEE?

Yes. OEE = availability × performance × quality, calculated per machine, mould, shift and day from run time, downtime reasons, cycle times and rejects.

Can it manage rubber compound recipes?

Yes. Recipes in parts per hundred rubber (phr) are versioned, scaled to batch size, and every mixing batch is recorded with its test results such as hardness and rheometer data.

How is regrind handled?

Runners, rejects and purge are weighed, granulated and returned as regrind with a maximum mix ratio per product. Scrap that cannot be reused is valued and sold.

Can it connect to our moulding machines?

Yes, we connect machine PLCs or use simple counters and shop-floor tablets, depending on your machines.

How long does implementation take?

Typically about 8 to 11 weeks for a single plant, including moulds, recipes, machine links, training and a pilot cell.

Get In Touch

Ready to mould your growth?

Tell us what you want to build, your products, plants and current tools. We reply within 4 business hours with honest advice.

⏰
Response TimeWithin 4 business hours (your timezone)
Send Us a Message