Built to last ERP for building material makers and distributors

Building material ERP from the plant gate to the dealer's yard

Dealer network and credit, price lists and schemes, bulk stock, batch production, quality testing and dispatch with weighbridge and proof of delivery, in one system for cement, concrete, brick, tile, steel and paint businesses.

  • Dealer credit control
  • Auto schemes
  • Weighbridge dispatch
Every product line

One ERP for the whole building material range

Each product keeps its own units, price lists and quality checks, from bags and tonnes to cubic metres and boxes.

  • Bricks & blocks
  • Cement
  • Ready-mix concrete
  • TMT steel
  • Tiles & stone
  • Aggregates & sand
  • Paints & coatings
  • Sanitary & pipes
Why companies switch

Five cracks in the foundation

Each one leaks margin or cash every month. Each one has a fix.

Dealer credit out of control

Orders ship to dealers already over their limit.

Fixed with: Credit limits and overdue holds at order entry

Schemes calculated by hand

Quantity slabs and cash discounts are worked out in Excel after the month ends.

Fixed with: Schemes applied automatically on every invoice

Trucks waiting at the gate

Loading, weighbridge and invoicing are done one after another.

Fixed with: Gate-to-gate dispatch with weighbridge link

Bulk stock is a guess

Silo and yard levels are estimated, not measured.

Fixed with: Silo, yard and godown stock in real time

Quality records on paper

Cube tests and batch results are hard to find when a customer complains.

Fixed with: Batch and test records linked to each delivery
Dealer pricing

See the dealer's landed price instantly

A sample cement order. Change the list price, quantity, discount and freight. The quantity slab scheme applies itself, just as it does on an ERP invoice. Figures are illustrative.

Converted at approximate rates. Your choice is remembered across pages.
Under 500 bags
no slab
500+ bags
1,000+ bags
2,000+ bags
Slab scheme / bag
Freight / bag
Landed price / bag
Order value (before tax)

Taxes such as GST or VAT are added on the invoice.

Dealer network

Every distributor, dealer and retailer in view

Territories, targets, outstanding and credit limits for each tier. Orders that break a credit rule are held before they ship. Sample network.

18Distributors
Credit used
72%
240Dealers
Credit used
64%
1,650Retailers
Credit used
41%
Dispatch & logistics

Gate to delivery, one trip at a time

Orders, loading, weighbridge, invoice, e-way bill and proof of delivery are recorded as the truck moves. Sample trip.

See dispatch and logistics
  1. 08:10
    Order confirmedSO-5521 · 30 t OPC 53
  2. 08:42
    Gate inTruck MH 12 AB 4471
  3. 09:15
    Loaded600 bags · weighbridge 30.1 t
  4. 09:18
    Invoice and e-way billGenerated automatically
  5. 09:20
    In transit42 km · ETA 10:40
  6. 10:36
    DeliveredPOD photo and signature
Bulk inventory

Silos, yards and godowns at a glance

Stock is kept in the unit that fits each material and converted automatically. Low levels trigger purchase or production. Sample plant.

Cement silo 1OPC 53820 t of 1,050 t
Cement silo 2PPC357 t of 1,050 t
Fly ash siloClass F310 t of 500 t
Aggregate yard20 mm2,640 m³ of 3,000 m³
7-day strength28-day strengthGrade target
M207 d 14.2 · 28 d 26.1 MPa
M257 d 17.8 · 28 d 31.4 MPa
M307 d 21.5 · 28 d 36.2 MPa
M407 d 28.9 · 28 d 47.8 MPa
Batch production & quality

Every batch tested and traceable

Mix designs, batch records and cube tests are linked to each delivery. If a customer raises a concern, the batch and its results are one click away. Sample concrete results.

See quality testing
Integrations

Connected to weighbridges, plants and trucks

Weights, batch records and trip status flow in without manual entry.

WeighbridgesGross, tare and net weights on the invoice
Batching plantsBatch records straight into production
GPS and fleet trackersLive trip status and ETAs
GST e-invoice and e-way billGenerated with every dispatch (India)
AccountingTally, Zoho Books or our finance module
Dealer and sales appOrders, payments and visit reports
Implementation

Live in about 9 to 11 weeks

A typical rollout for one plant and its dealer network.

W0W3W6W9W11
Discovery and plant walk
Items, price lists and schemes
Dealers, credit and orders
Dispatch and weighbridge
Production and quality
Dealer app, training, go-live
Results

What building material clients aim for

Typical improvement targets we plan against, not guarantees.

Dealer creditchecked on every order
Scheme errorsremoved from invoices
Truck turnaroundfaster gate to gate
Stock accuracysilo to godown
Who it is for

Built for makers and distributors

Tap your segment for the most relevant page.

Which modules do you need?

Get a free module recommendation for your business in a few minutes.

Start the free ERP audit
FAQ

Building material ERP questions

Straight answers to what plants and distributors ask us most.

What is a building material ERP?

An ERP for makers and distributors of cement, concrete, bricks, tiles, steel, paints and similar products. It manages dealers and credit, price lists and schemes, bulk stock, production, quality testing and dispatch alongside purchasing, sales and accounts.

Can it manage dealer credit and outstanding?

Yes. Each dealer has a credit limit and payment terms. Orders that would go over the limit, or come from dealers with overdue bills, are held for approval.

How are schemes and discounts handled?

Quantity slabs, cash discounts, regional prices and target incentives are set up once and applied automatically on invoices, with scheme reports by dealer and month.

Does it connect to weighbridges?

Yes. Gross and tare weights come from the weighbridge, so net weight on the invoice matches what was loaded.

Can it track bulk stock in silos and yards?

Yes. Stock can be kept in bags, tonnes or cubic metres, with conversions, and silo levels can come from sensors or daily dips.

Does it support ready-mix concrete batching?

Yes. Mix designs, batch records, delivery tickets and cube test results are linked to each order and pour.

Can it create GST e-invoices and e-way bills?

For Indian businesses, yes: e-invoices and e-way bills are generated with each dispatch. Other tax setups are configured per country.

How long does implementation take?

Typically about 9 to 11 weeks for a plant with its dealer network, including price lists, schemes, dispatch, quality, the dealer app and training.

Get In Touch

Ready to build on solid ground?

Tell us what you want to build, your products, plants and current tools. We reply within 4 business hours with honest advice.

⏰
Response TimeWithin 4 business hours (your timezone)
Send Us a Message